OUR PROCESS
–
We aim to make our process as simple as possible for everybody involved. To help understand what you can expect from us, we’ve created a basic outline of our process;
Step 1 – Discussion
Whether this happens in person (preferred) or over the phone, we like to learn and establish the basic details of your project. If we think we can help you – great. If not, we can provide basic advice and recommendations for your next steps.
Step 2 – On-Site Inspection
Our next step is to visit the site / location of work. We check basics – things like access to your property, the suitability and practicalities of the existing structure, layout and preferred materials. We like to find-out the finer details of your project and go over drawings with a fine tooth-comb to make sure there are no nasty surprises later in the project.
Step 3 – Final Estimation
Once we have all the details, we will provide you with a final, fully-costed estimate for the works. At this stage, we can go over suitable alternatives if you need help managing your budget.
Step 4 – Works Begin
Once we understand the scope of work, prices are confirmed and a security deposit amount is paid, we can begin work on your project. For more information on deposits and project timescales, see – https://healyandmangan.ie/faqs/
We create and build everything in-house at our own workshop, so we have complete control of our lead times.
Step 5 – Installation
Where suitable, some of our joinery work can take place on-site, but in most cases, the majority of our work will take place in our workshop to reduce time for installation on-site. We will work together to find a suitable time to install the joinery. We are a highly experienced team who are tidy and efficient, so we aim to make our time on-site as streamlined as possible and take no more than is absolutely necessary.


